Some flow beta. Clavey, NF T

FYI. as of 5/26/19.

Road to upper clavey put in is paved and open. road to upper clavey take out is gated at least 6mi from the bridge, seemingly with no plan to reopen. Clavey currently running very high (tribs ~3x flow by bridge delineating upper from lower) guestimate ~1200-1400 cfs at the bridge. On the upside the upper run is much more IV+/v at this flows and is reminiscent of SFY 49-B at 800-1000 level.

NF Toulumne is running at a low/med level. Good for first time down. Good mix of high quality and mank rapid. plan on 4-6 hours for class V crew on their first time down.